Triple

T30495162
Position Surface form Disambiguated ID Type / Status
Subject Ho Chi Minh City urban rail development plan E775984 entity
Predicate instanceOf P0 FINISHED
Object urban rail development plan C35368 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban rail development plan
Context triple: [Ho Chi Minh City urban rail development plan, instanceOf, urban rail development plan]
  • A. urban rail loop line
    An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
  • B. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • C. rapid transit expansion project chosen
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • D. commuter rail project
    A commuter rail project is a coordinated planning, design, and construction effort to develop or improve rail services that transport passengers between suburbs or outlying regions and a central urban area, typically focused on reducing congestion and improving regional mobility.
  • E. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22498c5d481908aaea89e6fab8280 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:14 p.m.