Triple

T30486268
Position Surface form Disambiguated ID Type / Status
Subject Lingen nuclear power plant E775729 entity
Predicate hasNearbyFacility P5648 FINISHED
Object Emsland nuclear power plant
The Emsland nuclear power plant is a former German nuclear power station in Lower Saxony that was part of the country’s commercial nuclear energy fleet before its shutdown under Germany’s nuclear phase-out policy.
E1917392 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Emsland nuclear power plant | Statement: [Lingen nuclear power plant, hasNearbyFacility, Emsland nuclear power plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Emsland nuclear power plant
Triple: [Lingen nuclear power plant, hasNearbyFacility, Emsland nuclear power plant]
Generated description
The Emsland nuclear power plant is a former German nuclear power station in Lower Saxony that was part of the country’s commercial nuclear energy fleet before its shutdown under Germany’s nuclear phase-out policy.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22497f91c8190afa7165bc900accd completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69f6874635ac8190b371d40aa40ee070 completed May 2, 2026, 11:22 p.m.
NED1 Entity disambiguation (via context triple) batch_6a27ac29e81c819090435c1f3c8eccad completed June 9, 2026, 6:01 a.m.
NEDg Description generation batch_6a27af1f46f48190b11f882834161dce completed June 9, 2026, 6:13 a.m.
NED2 Entity disambiguation (via description) batch_6a27af7f46b48190b0c6d95ca561127f completed June 9, 2026, 6:15 a.m.
Created at: April 29, 2026, 8:13 p.m.