Triple

T30486241
Position Surface form Disambiguated ID Type / Status
Subject Lingen nuclear power plant E775729 entity
Predicate instanceOf P0 FINISHED
Object former nuclear power plant C16257 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former nuclear power plant
Context triple: [Lingen nuclear power plant, instanceOf, former nuclear power plant]
  • A. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • B. decommissioned nuclear reactor chosen
    A decommissioned nuclear reactor is a permanently shut-down nuclear facility that has been defueled, dismantled or secured, and placed under long-term monitoring and waste management to ensure ongoing safety and environmental protection.
  • C. former nuclear test site
    A former nuclear test site is a geographically defined area where nuclear weapons or devices were previously detonated for testing purposes and which may still be subject to environmental monitoring, contamination concerns, and restricted use.
  • D. former industrial plant
    A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
  • E. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22497f91c8190afa7165bc900accd completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:13 p.m.