Triple

T30470930
Position Surface form Disambiguated ID Type / Status
Subject SEPTA NHSL E775289 entity
Predicate instanceOf P0 FINISHED
Object high-speed line C51991 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-speed line
Context triple: [SEPTA NHSL, instanceOf, high-speed line]
  • A. high-speed railway chosen
    A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
  • B. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • C. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • D. high-speed test train
    A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
  • E. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2249622a48190b1fae2e3e4ee958a completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:11 p.m.