Triple
T3046391
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yale University Globalization Center (Betts House renovation and addition) |
E83458
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | renovation and expansion project |
C5246
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: renovation and expansion project Context triple: [Yale University Globalization Center (Betts House renovation and addition), instanceOf, renovation and expansion project]
-
A.
architectural renovation project
chosen
An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
-
B.
architectural remodeling project
An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
-
C.
building alteration
A building alteration is a modification or change to an existing structure’s design, layout, or components that does not constitute complete demolition or new construction.
-
D.
healthcare facility expansion program
A healthcare facility expansion program is a coordinated initiative to increase a medical institution’s capacity, services, and infrastructure to better meet current and future patient care needs.
-
E.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b24924c8190a9bb6f61d519e4ae |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 3:01 p.m.