Triple

T30386604
Position Surface form Disambiguated ID Type / Status
Subject Plasma Mobile E772969 entity
Predicate instanceOf P0 FINISHED
Object KDE project C56090 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: KDE project
Context triple: [Plasma Mobile, instanceOf, KDE project]
  • A. KDE software component chosen
    A KDE software component is a modular, reusable piece of functionality within the KDE ecosystem that provides specific features or services to applications and the desktop environment.
  • B. Fedora project
    The Fedora Project is a community-driven open source initiative that develops the Fedora Linux distribution and related technologies, focusing on innovation, freedom, and collaboration.
  • C. SUSE technology
    SUSE technology encompasses a suite of enterprise-grade open source solutions, including Linux distributions, container management, and cloud-native platforms, designed to provide scalable, secure, and reliable IT infrastructure.
  • D. GNOME component
    A GNOME component is a modular software element within the GNOME desktop environment that provides specific functionality or services, such as panels, applets, libraries, or system tools, to create a cohesive user experience.
  • E. MATE desktop component
    A MATE desktop component is an individual software element (such as a panel, applet, or system tool) that provides a specific piece of functionality within the MATE desktop environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248ef0a48190aa54d4d8ac3e5758 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:01 p.m.