Triple

T3036840
Position Surface form Disambiguated ID Type / Status
Subject Kraków Film Festival E83030 entity
Predicate instanceOf P0 FINISHED
Object animation film festival C2553 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: animation film festival
Context triple: [Kraków Film Festival, instanceOf, animation film festival]
  • A. animated film collection
    A curated set of animated movies grouped together, typically organized by theme, studio, director, franchise, or audience, and managed as a single unit for viewing or distribution.
  • B. cel-animated film
    A cel-animated film is a motion picture created by photographing sequences of hand-drawn or painted images on transparent sheets (cels) over static backgrounds to produce the illusion of movement.
  • C. film festival award
    A film festival award is a recognition given at a film festival to honor outstanding achievements in filmmaking, such as directing, acting, writing, or technical craft, among the works presented at the event.
  • D. film festival chosen
    A film festival is an organized, often multi-day event where a curated selection of films is publicly screened, frequently accompanied by competitions, awards, and related cultural activities.
  • E. animated short film series
    An animated short film series is a collection of brief, stylized animated works that share common characters, themes, or a narrative universe, released as multiple episodes or installments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b2298908190a7cb4e9bdbf064d0 completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:01 p.m.