Triple

T3036083
Position Surface form Disambiguated ID Type / Status
Subject Mr. T E83011 entity
Predicate instanceOf P0 FINISHED
Object personal computer prototype C23 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: personal computer prototype
Context triple: [Mr. T, instanceOf, personal computer prototype]
  • A. mechanical computer
    A mechanical computer is a device that performs calculations or processes information using purely mechanical components such as gears, levers, and cams instead of electronic circuits.
  • B. IBM PC compatible
    An IBM PC compatible is a computer system that can run the same software and use the same peripherals as the original IBM Personal Computer by adhering to its hardware and BIOS standards.
  • C. CMOS microprocessor
    A CMOS microprocessor is a central processing unit implemented using complementary metal-oxide-semiconductor technology, providing high integration, low power consumption, and reliable digital computation on a single chip.
  • D. research prototype chosen
    A research prototype is an early, often experimental implementation of a concept or system created to explore feasibility, validate ideas, and gather feedback before full-scale development.
  • E. Amiga computer
    An Amiga computer is a family of personal computers developed by Commodore in the 1980s and early 1990s, known for their advanced multimedia capabilities, custom chipset, and multitasking operating system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b2298908190a7cb4e9bdbf064d0 completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:01 p.m.