Triple

T303279
Position Surface form Disambiguated ID Type / Status
Subject Hoover Dam E6243 entity
Predicate instanceOf P0 FINISHED
Object arch-gravity dam C3633 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: arch-gravity dam
Context triple: [Hoover Dam, instanceOf, arch-gravity dam]
  • A. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • B. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • C. pond
    A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
  • D. alpine lake
    An alpine lake is a high-altitude body of freshwater, typically formed by glacial activity, characterized by cold, clear water and surrounded by mountainous terrain.
  • E. lake
    A lake is a sizable, inland body of standing water, typically surrounded by land and fed by rivers, streams, precipitation, or groundwater.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e79230508190b912ecb555aae17e completed Feb. 28, 2026, 1:03 p.m.
Created at: Feb. 28, 2026, 1:06 p.m.