Triple

T30301075
Position Surface form Disambiguated ID Type / Status
Subject Heldenorgel E770652 entity
Predicate instanceOf P0 FINISHED
Object outdoor pipe organ C2009 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: outdoor pipe organ
Context triple: [Heldenorgel, instanceOf, outdoor pipe organ]
  • A. outdoor pipe organ pavilion
    An outdoor pipe organ pavilion is an open-air architectural structure designed to house and project the sound of a pipe organ for public performances and gatherings.
  • B. pipe organ chosen
    A pipe organ is a large musical instrument that produces sound by forcing air through a series of tuned pipes controlled from one or more keyboards and a pedalboard.
  • C. pipe organ builder
    A pipe organ builder is a craftsman who designs, constructs, voices, and maintains pipe organs, integrating woodworking, metalworking, acoustics, and musical artistry.
  • D. standing organ
    A standing organ is a large, vertically structured keyboard instrument with multiple ranks of pipes arranged in an upright configuration, designed to produce a wide range of sustained musical tones in performance spaces such as churches or concert halls.
  • E. outdoor music event
    An outdoor music event is a planned gathering held in an open-air setting where live or recorded music is performed for an audience, often accompanied by social, recreational, and cultural activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224881b948190b8c4921b250a44a3 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:48 p.m.