Triple
T3029686
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | River Kent |
E82861
|
entity |
| Predicate | flowsUnder |
P45083
|
FINISHED |
| Object | A6 road |
E70855
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A6 road | Statement: [River Kent, flowsUnder, A6 road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: A6 road Context triple: [River Kent, flowsUnder, A6 road]
-
A.
A6 road
chosen
The A6 road is a major long-distance route in England that runs from Luton in the south to Carlisle in the north, passing through several key towns and cities in the Midlands and North West.
-
B.
A64 road
The A64 road is a major route in northern England that links Leeds and York to the coastal town of Scarborough.
-
C.
A26 road
The A26 road is a major route in Northern Ireland that connects Ballymena with other key towns and regions, serving as an important corridor for local and regional traffic.
-
D.
A62 road
The A62 road is a major route in northern England that runs between Manchester and Leeds, passing through several towns and urban areas along the way.
-
E.
A16 road
The A16 road is a major route in eastern England that runs through Lincolnshire and connects key towns such as Grimsby, Louth, and Spalding.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b21a62881908ec5dd4fba4a187c |
completed | March 8, 2026, 2:43 p.m. |
| NER | Named-entity recognition | batch_69ad9e13f16c81909e11ed1444c71151 |
completed | March 8, 2026, 4:04 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ca6d6a17b4819089eafc70ecc1f786 |
completed | March 30, 2026, 12:32 p.m. |
Created at: March 8, 2026, 3 p.m.