Triple

T30292134
Position Surface form Disambiguated ID Type / Status
Subject Metro Liner E770407 entity
Predicate instanceOf P0 FINISHED
Object bus rapid transit brand C7634 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bus rapid transit brand
Context triple: [Metro Liner, instanceOf, bus rapid transit brand]
  • A. bus rapid transit line
    A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
  • B. bus rapid transit facility
    A bus rapid transit facility is a dedicated infrastructure element—such as stations, lanes, and terminals—designed to support high-capacity, fast, and reliable bus-based public transportation.
  • C. regional rail service brand
    A regional rail service brand is a distinct identity used to market and organize passenger train services within a specific geographic area, encompassing naming, visual design, and service characteristics.
  • D. public transit brand chosen
    A public transit brand is the cohesive identity—encompassing name, visuals, messaging, and perceived values—that distinguishes a transit agency’s services and shapes how riders recognize, trust, and experience the system.
  • E. bus rapid transit station group
    A bus rapid transit station group is a coordinated set of closely spaced BRT stations or platforms that function together as a single operational unit to serve high-capacity, high-frequency bus services along a corridor.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224875c288190a9b96b975006ec4a completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:47 p.m.