Triple

T302470
Position Surface form Disambiguated ID Type / Status
Subject CommissarOrderImplementation E6227 entity
Predicate instanceOf P0 FINISHED
Object Nazi policy implementation C860 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Nazi policy implementation
Context triple: [CommissarOrderImplementation, instanceOf, Nazi policy implementation]
  • A. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • B. Cold War policy
    Cold War policy refers to the strategic, political, military, and economic decisions and doctrines adopted by states—primarily the United States and the Soviet Union—to contain, compete with, or influence each other and their allies without escalating into direct large-scale war.
  • C. instrument of state terror chosen
    An instrument of state terror is any tool, policy, institution, or practice deliberately used by a government to instill fear, suppress dissent, and maintain control through intimidation and violence.
  • D. Holocaust site
    A Holocaust site is a location directly associated with the persecution, deportation, forced labor, or mass murder of Jews and other targeted groups by Nazi Germany and its collaborators during the Holocaust.
  • E. postwar occupation
    Postwar occupation is the temporary control and administration of a defeated state’s territory by foreign military or allied authorities to manage security, political transition, and reconstruction after armed conflict.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e79230508190b912ecb555aae17e completed Feb. 28, 2026, 1:03 p.m.
Created at: Feb. 28, 2026, 1:06 p.m.