Triple

T30219048
Position Surface form Disambiguated ID Type / Status
Subject 重庆轨道交通 E768289 entity
Predicate instanceOf P0 FINISHED
Object 快速交通系统 C31796 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 快速交通系统
Context triple: [重庆轨道交通, instanceOf, 快速交通系统]
  • A. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • B. rapid transit network chosen
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • C. high-speed railway
    A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
  • D. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • E. proposed high-speed ground transportation system
    A proposed high-speed ground transportation system is a conceptual network of advanced vehicles, infrastructure, and control technologies designed to move passengers or freight rapidly and efficiently between destinations along dedicated terrestrial corridors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2247fd8b8819087fcf83cb7a05eb8 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:34 p.m.