Triple

T30163136
Position Surface form Disambiguated ID Type / Status
Subject Tridente streets of Rome E766721 entity
Predicate instanceOf P0 FINISHED
Object urban layout C37571 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban layout
Context triple: [Tridente streets of Rome, instanceOf, urban layout]
  • A. urban street grid
    An urban street grid is a planned network of intersecting streets, typically arranged in a regular, rectangular pattern, that organizes city blocks, guides movement, and shapes land use within an urban area.
  • B. urban planning structure chosen
    An urban planning structure is a designed physical or organizational element within a city—such as streets, parks, zoning frameworks, or transit systems—that shapes how urban space is organized, used, and experienced.
  • C. urban plaza
    An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
  • D. urban ensemble
    An urban ensemble is a cohesive grouping of buildings, public spaces, and infrastructure whose combined form, function, and character create a distinct, perceivable urban identity.
  • E. urban-edge landscape
    An urban-edge landscape is a transitional zone where city infrastructure meets natural or semi-natural environments, blending built elements with green spaces to mediate ecological, social, and visual boundaries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2247a968881909d79c18f2bfcb275 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:22 p.m.