Triple

T30158833
Position Surface form Disambiguated ID Type / Status
Subject British coastal time signal network E766600 entity
Predicate instanceOf P0 FINISHED
Object British infrastructure C3206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British infrastructure
Context triple: [British coastal time signal network, instanceOf, British infrastructure]
  • A. cross-Channel transport infrastructure
    Cross-Channel transport infrastructure encompasses the physical and operational systems—such as tunnels, ports, terminals, and associated logistics facilities—that enable the movement of people and goods between the UK and mainland Europe across the English Channel.
  • B. infrastructure chosen
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. road in the United Kingdom
    A road in the United Kingdom is a public or private thoroughfare designed for vehicular and pedestrian travel, classified and regulated according to national standards such as motorways, A-roads, B-roads, and local streets.
  • D. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • E. cross-London rail system
    A cross-London rail system is an integrated network of rail lines and tunnels that traverse the city from one side to the other, providing high-capacity, rapid transit across central London and connecting outer suburbs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22479cd088190ab4c6f3fce39d1c5 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:21 p.m.