Triple
T30154928
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Baopingkou (Bottle-Neck) channel |
E766496
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water-diversion channel |
C26460
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water-diversion channel Context triple: [Baopingkou (Bottle-Neck) channel, instanceOf, water-diversion channel]
-
A.
drainage channel
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
-
B.
diversion dam
A diversion dam is a low barrier built across a river or stream to redirect water into canals, pipelines, or other conveyance systems for irrigation, municipal use, or hydropower, rather than for large-scale storage.
-
C.
engineered waterway
chosen
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
D.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
E.
water supply tunnel
A water supply tunnel is an underground passage constructed to convey water from its source to treatment facilities, storage reservoirs, or distribution networks, often over long distances and through challenging terrain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22479cd088190ab4c6f3fce39d1c5 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:20 p.m.