Triple
T30140893
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bell Street Pier |
E766124
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cruise terminal facility |
C37209
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cruise terminal facility Context triple: [Bell Street Pier, instanceOf, cruise terminal facility]
-
A.
ferry terminal
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
-
B.
maritime cargo terminal
A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
-
C.
docking facility
chosen
A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
-
D.
port facility complex
A port facility complex is an integrated area of land and water with infrastructure, equipment, and services designed to support the berthing, loading, unloading, storage, and transfer of cargo and passengers between sea and land transport modes.
-
E.
port crane
A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2247909048190ae86c2160cf8b566 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:17 p.m.