Triple
T30134472
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Porte Maillot bus station |
E765949
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coach terminal |
C37500
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coach terminal Context triple: [Porte Maillot bus station, instanceOf, coach terminal]
-
A.
transport terminal
chosen
A transport terminal is a designated facility where passengers or goods begin, end, or transfer between different modes or routes of transportation.
-
B.
terminal station
A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
-
C.
tram station
A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
-
D.
terminal railroad
A terminal railroad is a short-line or switching railroad that operates within a limited area, typically serving as an interchange point between major railroads and local industries, handling the transfer, classification, and delivery of freight cars.
-
E.
train station
A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22477d1a081908df2b7e6ed16859d |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:16 p.m.