Triple

T30104766
Position Surface form Disambiguated ID Type / Status
Subject Cézanne’s L’Estaque landscapes E765101 entity
Predicate instanceOf P0 FINISHED
Object Post-Impressionist paintings C13762 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Post-Impressionist paintings
Context triple: [Cézanne’s L’Estaque landscapes, instanceOf, Post-Impressionist paintings]
  • A. Post-Impressionist artwork chosen
    A Post-Impressionist artwork is a late-19th to early-20th-century piece that builds on Impressionism’s use of color and light but emphasizes more structured composition, symbolic content, and expressive, often subjective, emotional impact.
  • B. Neo-Impressionist painting
    A Neo-Impressionist painting is a late 19th-century artwork characterized by scientifically informed, methodical brushwork—often using small dots or strokes of pure color—to achieve luminous, optically mixed effects and harmonious compositions.
  • C. post‑Impressionist painter
    A post-Impressionist painter is an artist who, building on Impressionism’s focus on light and color, emphasizes more expressive, symbolic, or structured forms to convey deeper emotional or conceptual content.
  • D. Precisionist painting
    Precisionist painting is a modernist art style characterized by sharply defined, geometric forms and smooth, simplified surfaces that idealize industrial and urban subjects.
  • E. Impressionist artist
    An Impressionist artist is a painter who captures fleeting moments of light, color, and atmosphere through loose brushwork and an emphasis on sensory impressions rather than precise detail.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22474e4288190b5f895fe3974aa92 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:09 p.m.