Triple
T30029865
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kemano hydroelectric project |
E762985
|
entity |
| Predicate | watercourse |
P415
|
FINISHED |
| Object |
Kemano River
The Kemano River is a remote river in northwestern British Columbia, Canada, that drains into Gardner Canal and serves as the water source for the large Kemano hydroelectric power project built to supply electricity to the Kitimat aluminum smelter.
|
E1926824
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kemano River | Statement: [Kemano hydroelectric project, watercourse, Kemano River]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Kemano River Triple: [Kemano hydroelectric project, watercourse, Kemano River]
Generated description
The Kemano River is a remote river in northwestern British Columbia, Canada, that drains into Gardner Canal and serves as the water source for the large Kemano hydroelectric power project built to supply electricity to the Kitimat aluminum smelter.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2246ee6e48190b69e837b913b398a |
completed | April 29, 2026, 3:31 p.m. |
| NER | Named-entity recognition | batch_69f679af17648190bc90c5dc4afe35e4 |
completed | May 2, 2026, 10:24 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a2870c991f481909ed5fbeb944d86fe |
completed | June 9, 2026, 8 p.m. |
| NEDg | Description generation | batch_6a28772713408190b28cee61e4f7df22 |
completed | June 9, 2026, 8:27 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a2877db776c8190b2e93df097522486 |
completed | June 9, 2026, 8:30 p.m. |
Created at: April 29, 2026, 6:49 p.m.