Triple
T30028558
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zanesville Y-Bridge |
E762949
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Y-shaped bridge |
C43293
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Y-shaped bridge Context triple: [Zanesville Y-Bridge, instanceOf, Y-shaped bridge]
-
A.
twin-span bridge
A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
-
B.
causeway-style bridge
A causeway-style bridge is a low, often long roadway structure built across water, wetlands, or low-lying terrain, typically supported by embankments or short spans rather than tall piers.
-
C.
bridge structure
chosen
A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
-
D.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
E.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2246ee6e48190b69e837b913b398a |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 6:49 p.m.