Triple

T29980053
Position Surface form Disambiguated ID Type / Status
Subject New Mexico Scenic and Recreational River (upper reaches) E761561 entity
Predicate instanceOf P0 FINISHED
Object recreational river C28164 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: recreational river
Context triple: [New Mexico Scenic and Recreational River (upper reaches), instanceOf, recreational river]
  • A. scenic and recreational river chosen
    A scenic and recreational river is a naturally flowing waterway and its adjacent lands that are preserved for their outstanding natural beauty, ecological value, and opportunities for outdoor activities such as boating, fishing, and hiking.
  • B. river rapids
    River rapids are fast-flowing, turbulent sections of a river where water rushes over obstacles and steep gradients, creating waves, eddies, and whitewater.
  • C. whitewater recreation area
    A whitewater recreation area is a designated natural or artificial river section engineered or managed to provide safe, accessible environments for activities like rafting, kayaking, and canoeing in fast-moving, turbulent water.
  • D. river
    A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
  • E. recreational dam
    A recreational dam is a structure built across a waterway primarily to create and manage water bodies for leisure activities such as boating, fishing, and swimming, rather than for industrial, agricultural, or hydroelectric purposes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2246851148190b8e76206db94b105 completed April 29, 2026, 3:31 p.m.
Created at: April 29, 2026, 6:34 p.m.