Triple

T29968860
Position Surface form Disambiguated ID Type / Status
Subject Gentzen’s consistency proof for arithmetic E761263 entity
Predicate instanceOf P0 FINISHED
Object consistency proof C26889 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: consistency proof
Context triple: [Gentzen’s consistency proof for arithmetic, instanceOf, consistency proof]
  • A. construction in proof theory
    A construction in proof theory is a systematically defined method or procedure used within formal proofs to build objects, derive new statements, or transform existing proofs while preserving logical validity.
  • B. result in proof theory chosen
    In proof theory, a result is a formally derived conclusion or theorem obtained from a given set of axioms and inference rules within a logical system.
  • C. proof assistant
    A proof assistant is a software tool that helps users construct, check, and manage formal mathematical proofs or program correctness proofs by interacting with a rigorous logical framework.
  • D. theorem prover
    A theorem prover is a software system or algorithm that automatically or semi-automatically checks the validity of logical statements by deriving conclusions from axioms and inference rules.
  • E. problem in confirmation theory
    A problem in confirmation theory is a conceptual challenge or paradox that questions how evidence supports, undermines, or fails to affect the rational credibility of hypotheses.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22467626081908d5afea489590e96 completed April 29, 2026, 3:31 p.m.
Created at: April 29, 2026, 6:31 p.m.