Triple

T2994744
Position Surface form Disambiguated ID Type / Status
Subject Launch Control Center Firing Rooms E81039 entity
Predicate instanceOf P0 FINISHED
Object mission control room complex C4504 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mission control room complex
Context triple: [Launch Control Center Firing Rooms, instanceOf, mission control room complex]
  • A. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • B. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • C. spaceflight center chosen
    A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
  • D. NASA spaceport
    A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
  • E. spaceport facility
    A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b187fc8819085914d3c9ea3142d completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 2:59 p.m.