Triple
T2994615
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Launch Control Center |
E81036
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mission control center |
C4504
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mission control center Context triple: [Launch Control Center, instanceOf, mission control center]
-
A.
NASA center
A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
-
B.
space operations command
A space operations command is a military or governmental organizational unit responsible for planning, directing, and controlling space-based assets and activities to support national security, communications, navigation, and situational awareness.
-
C.
spaceflight center
chosen
A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
-
D.
NASA field center precursor
A NASA field center precursor is an early organizational entity, facility, or program that laid the technical, institutional, or infrastructural groundwork for the later establishment of a formal NASA field center.
-
E.
NASA spaceport
A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b187fc8819085914d3c9ea3142d |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 2:59 p.m.