Triple

T29933024
Position Surface form Disambiguated ID Type / Status
Subject Seton River E760272 entity
Predicate partOf P40 FINISHED
Object Bridge River–Seton hydroelectric system
The Bridge River–Seton hydroelectric system is a major hydroelectric power complex in British Columbia, Canada, that integrates multiple dams, reservoirs, and generating stations to produce electricity from the Bridge and Seton river watersheds.
E1890743 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bridge River–Seton hydroelectric system | Statement: [Seton River, partOf, Bridge River–Seton hydroelectric system]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Bridge River–Seton hydroelectric system
Triple: [Seton River, partOf, Bridge River–Seton hydroelectric system]
Generated description
The Bridge River–Seton hydroelectric system is a major hydroelectric power complex in British Columbia, Canada, that integrates multiple dams, reservoirs, and generating stations to produce electricity from the Bridge and Seton river watersheds.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224631674819080c8d089674f9f4f completed April 29, 2026, 3:31 p.m.
NER Named-entity recognition batch_69f677d229c0819080f81bacb3881666 completed May 2, 2026, 10:16 p.m.
NED1 Entity disambiguation (via context triple) batch_6a271423c85881908f0d1b23cf589cb4 completed June 8, 2026, 7:12 p.m.
NEDg Description generation batch_6a27150eabc08190b332d916627afedf completed June 8, 2026, 7:16 p.m.
NED2 Entity disambiguation (via description) batch_6a2716b75fbc81909a83533f33033a4b completed June 8, 2026, 7:23 p.m.
Created at: April 29, 2026, 6:18 p.m.