Triple

T2992753
Position Surface form Disambiguated ID Type / Status
Subject Victoria-class submarine E80993 entity
Predicate modernizationPurpose P44567 FINISHED
Object to meet Canadian operational requirements LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: to meet Canadian operational requirements | Statement: [Victoria-class submarine, modernizationPurpose, to meet Canadian operational requirements]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: modernizationPurpose
Context triple: [Victoria-class submarine, modernizationPurpose, to meet Canadian operational requirements]
  • A. modernization
    Indicates a process by which something is updated, reformed, or transformed to align with contemporary standards, technologies, or practices.
  • B. modernizationFeatures
    Indicates that something includes characteristics, elements, or improvements associated with making it more modern or up to date.
  • C. modernizationPolicy
    Indicates the implementation or presence of policies aimed at updating, reforming, or advancing existing systems, structures, or practices.
  • D. modernizationPeriod
    Indicates the time span during which an entity undergoes or is subject to modernization efforts or processes.
  • E. modernizedFor
    Indicates that something has been updated, adapted, or improved to suit more recent standards, technologies, or conditions.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b187fc8819085914d3c9ea3142d completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad99e12c5c8190af7cc20e4c48bf45 completed March 8, 2026, 3:46 p.m.
PD Predicate disambiguation batch_69ad961403108190bbecb8d3608fd4e0 completed March 8, 2026, 3:30 p.m.
PDg Predicate description generation batch_69ad97f5d28c8190899d90204dc43428 completed March 8, 2026, 3:38 p.m.
Created at: March 8, 2026, 2:59 p.m.