Triple

T29918614
Position Surface form Disambiguated ID Type / Status
Subject Pratt Institute intercampus transportation system E759858 entity
Predicate instanceOf P0 FINISHED
Object intercampus transportation system C2489 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intercampus transportation system
Context triple: [Pratt Institute intercampus transportation system, instanceOf, intercampus transportation system]
  • A. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • B. continuous transport system
    A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
  • C. public transportation infrastructure chosen
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • D. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • E. campus axis
    A campus axis is a primary organizing line or pathway that structures the spatial layout, circulation, and visual relationships of buildings and open spaces across a campus.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2246189fc8190996b63ee1f9a2374 completed April 29, 2026, 3:31 p.m.
Created at: April 29, 2026, 6:13 p.m.