Triple
T29907110
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nossa Senhora da Paz Church |
E759567
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | church in Brazil |
C46090
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: church in Brazil Context triple: [Nossa Senhora da Paz Church, instanceOf, church in Brazil]
-
A.
church building in Brazil
chosen
A church building in Brazil is a religious structure, often blending colonial, baroque, or modern architectural styles, dedicated to Christian worship and community activities within the Brazilian cultural context.
-
B.
court church
A court church is a Christian place of worship that is directly associated with and often located near a royal or princely court, serving the spiritual needs and ceremonial functions of the ruling household.
-
C.
Jesuit church
A Jesuit church is a Roman Catholic church built, used, or administered by the Society of Jesus, typically characterized by Baroque or Renaissance architecture, a strong emphasis on preaching and education, and interior designs that promote clear visibility of the altar and pulpit.
-
D.
mission church
A mission church is a religious building or congregation established by a parent church or missionary organization to serve a specific community, often in a developing or newly evangelized area.
-
E.
museum in Brazil
A museum in Brazil is a cultural institution that collects, preserves, researches, and exhibits Brazilian and international art, history, and heritage for public education and enjoyment within the Brazilian context.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224600590819085e148a01c056ef6 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 6:09 p.m.