Triple
T29867732
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pixar production pipeline |
E758500
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | film production workflow |
C26379
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: film production workflow Context triple: [Pixar production pipeline, instanceOf, film production workflow]
-
A.
film production technology
Film production technology encompasses the tools, equipment, and digital systems used to plan, capture, edit, and distribute motion pictures.
-
B.
film production program
A film production program is an organized course of study or training that teaches the creative, technical, and logistical skills needed to develop, shoot, and edit motion picture projects.
-
C.
film and television production phase
chosen
A film and television production phase is a distinct stage in the creation process—such as development, pre-production, production, post-production, or distribution—during which specific tasks and workflows are carried out to move a project from concept to final release.
-
D.
post-production process
The post-production process is the stage in media creation where recorded material is edited, enhanced, and finalized through tasks such as cutting, sound design, visual effects, color correction, and mastering before distribution.
-
E.
film production services company
A film production services company is a business that provides specialized support such as crew, equipment, locations, logistics, and post-production resources to facilitate the making of films and other screen content.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2245b4dec8190b85f664d918a00a5 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 5:52 p.m.