Triple
T29865405
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Independent Electricity System Operator |
E758441
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | crown agency |
C45646
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: crown agency Context triple: [Independent Electricity System Operator, instanceOf, crown agency]
-
A.
crown building administration
Crown building administration is the organizational entity responsible for managing, maintaining, and regulating government-owned or sovereign properties and facilities.
-
B.
national central agency
chosen
A national central agency is a government body that coordinates, regulates, and oversees specific functions or policies at the national level, often serving as the primary authority and point of contact for those activities.
-
C.
crown colony
A crown colony is a type of colonial administration directly governed by the British Crown through an appointed governor, with limited or no self-rule by local inhabitants.
-
D.
managing agency
A managing agency is an organization or entity responsible for overseeing, coordinating, and administering the operations, resources, and strategic direction of a project, program, or group on behalf of its stakeholders or owners.
-
E.
Crown appointment
A crown appointment is an official position or office conferred by the reigning monarch, typically on the advice of government ministers, within a constitutional monarchy.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2245b4dec8190b85f664d918a00a5 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 5:51 p.m.