Triple

T29811527
Position Surface form Disambiguated ID Type / Status
Subject Southwest Pacific tectonic system E756979 entity
Predicate instanceOf P0 FINISHED
Object geologic system C8227 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geologic system
Context triple: [Southwest Pacific tectonic system, instanceOf, geologic system]
  • A. tectonic system chosen
    A tectonic system is the interconnected set of processes and structures through which Earth’s lithospheric plates move, interact, and reshape the planet’s surface over geological time.
  • B. geological model
    A geological model is a conceptual or computational representation of the Earth's subsurface that integrates geological data and interpretations to describe the distribution and properties of rocks, structures, and fluids in three dimensions (and sometimes through time).
  • C. geologic site
    A geologic site is a specific location where rock formations, landforms, or earth materials provide significant evidence about the Earth's geological history, processes, or resources.
  • D. geological basin
    A geological basin is a large, low-lying structural depression in the Earth's crust where sediments accumulate over time, often forming significant stratigraphic and resource-bearing sequences.
  • E. geological concept
    A geological concept is an abstract idea or principle used to explain the origin, structure, processes, and evolution of the Earth and its materials.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2245584848190ad4cab1f07752ccb completed April 29, 2026, 3:31 p.m.
Created at: April 29, 2026, 5:24 p.m.