Triple

T2977297
Position Surface form Disambiguated ID Type / Status
Subject Spyker C8 Laviolette E80428 entity
Predicate instanceOf P0 FINISHED
Object mid-engine car C12034 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mid-engine car
Context triple: [Spyker C8 Laviolette, instanceOf, mid-engine car]
  • A. mid-size executive car
    A mid-size executive car is a premium, comfortably appointed sedan or estate offering higher levels of refinement, performance, and features than mainstream family cars, aimed at professional and business users.
  • B. rear-wheel-drive vehicle architecture
    A rear-wheel-drive vehicle architecture is a drivetrain layout in which the engine’s power is transmitted primarily to the rear wheels, typically via a driveshaft and rear differential, to provide propulsion and handling characteristics.
  • C. compact MPV
    A compact MPV is a small, space-efficient multi-purpose vehicle designed to offer flexible seating and cargo configurations within a relatively short, city-friendly footprint.
  • D. V6 engine
    A V6 engine is an internal combustion engine with six cylinders arranged in two banks of three forming a "V" shape around a common crankshaft, balancing performance, compactness, and efficiency.
  • E. V6 engine
    A V6 engine is an internal combustion engine with six cylinders arranged in two banks of three forming a "V" shape around a common crankshaft.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b15f6ac8190be5fd16a33edcb4f completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 2:58 p.m.