Triple

T2976809
Position Surface form Disambiguated ID Type / Status
Subject Brussels suburban rail network E80417 entity
Predicate usesInfrastructureOwner P5683 FINISHED
Object Infrabel E322969 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Infrabel | Statement: [Brussels suburban rail network, usesInfrastructureOwner, Infrabel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Infrabel
Context triple: [Brussels suburban rail network, usesInfrastructureOwner, Infrabel]
  • A. Infrabel chosen
    Infrabel is the Belgian railway infrastructure manager responsible for the construction, maintenance, and operation of the national rail network.
  • B. SNCB/NMBS
    SNCB/NMBS is the Belgian national railway company responsible for operating most passenger train services and managing much of the rail infrastructure in Belgium.
  • C. Société des Transports Intercommunaux de Bruxelles
    The Société des Transports Intercommunaux de Bruxelles (STIB/MIVB) is the main public transport operator in Brussels, managing the city’s metro, tram, and bus networks.
  • D. Intercity Brussels
    Intercity Brussels is an international high-speed train service connecting the Netherlands with Brussels in Belgium.
  • E. STIB-MIVB
    STIB-MIVB is the primary public transport company in Brussels, Belgium, operating the city’s metro, tram, and bus networks.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b15f6ac8190be5fd16a33edcb4f completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad998c589c8190b4530f3fb8975187 completed March 8, 2026, 3:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69b23592a4888190a78fcae60f4971dd completed March 12, 2026, 3:40 a.m.
Created at: March 8, 2026, 2:58 p.m.