Triple

T2970346
Position Surface form Disambiguated ID Type / Status
Subject Belfast city centre waterfront regeneration E80263 entity
Predicate instanceOf P0 FINISHED
Object urban regeneration project C5822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban regeneration project
Context triple: [Belfast city centre waterfront regeneration, instanceOf, urban regeneration project]
  • A. urban regeneration area chosen
    An urban regeneration area is a designated part of a city targeted for coordinated physical, economic, social, and environmental improvements to reverse decline and promote sustainable development.
  • B. urban design project
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • C. urban development
    Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
  • D. urban renewal law
    Urban renewal law is the body of legal rules and policies that govern the planning, authorization, and implementation of projects to redevelop, revitalize, or repurpose urban areas, often involving land use regulation, property acquisition, zoning changes, and community protections.
  • E. urban plaza
    An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b14ffe881908ffed62f9595c867 completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 2:58 p.m.