Triple

T29698885
Position Surface form Disambiguated ID Type / Status
Subject Gentoo release engineering E751426 entity
Predicate instanceOf P0 FINISHED
Object Gentoo Linux project team C56105 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Gentoo Linux project team
Context triple: [Gentoo release engineering, instanceOf, Gentoo Linux project team]
  • A. Debian team
    A Debian team is a collaborative group of contributors responsible for maintaining, developing, and supporting specific packages, subsystems, or areas within the Debian operating system.
  • B. Fedora project
    The Fedora Project is a community-driven open source initiative that develops the Fedora Linux distribution and related technologies, focusing on innovation, freedom, and collaboration.
  • C. Debian project body
    The Debian project body is the collective organizational entity responsible for coordinating development, governance, and maintenance of the Debian operating system and its associated community processes.
  • D. division of the GNU Project
    A division of the GNU Project is an organizational unit within the GNU initiative that focuses on developing, maintaining, or coordinating a specific subset of GNU software, documentation, or related activities.
  • E. Mozilla project
    The Mozilla project is an open-source initiative focused on developing web technologies, applications, and standards that promote an open, accessible, and user-centric internet.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0d6266f8481909e70bb41cda18587 completed April 28, 2026, 3:45 p.m.
Created at: April 28, 2026, 7:22 p.m.