Triple

T29655227
Position Surface form Disambiguated ID Type / Status
Subject Warp Gate E750245 entity
Predicate instanceOf P0 FINISHED
Object building in StarCraft II C9215 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: building in StarCraft II
Context triple: [Warp Gate, instanceOf, building in StarCraft II]
  • A. planet-construction facility
    A planet-construction facility is a massive industrial complex designed to assemble, terraform, and stabilize artificial or heavily engineered planets using advanced energy, material, and environmental control systems.
  • B. fortified building chosen
    A fortified building is a heavily constructed structure designed with defensive features such as thick walls, limited entry points, and protective battlements to resist attacks and provide security for its occupants.
  • C. StarCraft faction
    A StarCraft faction is a distinct playable race or group, defined by unique units, technologies, and strategic mechanics that shape a player’s playstyle and tactics in the StarCraft universe.
  • D. UNSC stronghold
    A UNSC stronghold is a heavily fortified military installation designed to project United Nations Space Command power, protect strategic assets, and withstand sustained enemy assaults.
  • E. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0d6226fe881908819197c9ef9ee04 completed April 28, 2026, 3:45 p.m.
Created at: April 28, 2026, 6:54 p.m.