Triple
T29645381
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bottom-Up Narrows |
E755984
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canyon hike segment |
C48170
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canyon hike segment Context triple: [Bottom-Up Narrows, instanceOf, canyon hike segment]
-
A.
long-distance hiking trail segment
A long-distance hiking trail segment is a defined portion of an extended hiking route, characterized by continuous path alignment, consistent difficulty and terrain, and clear start and end points used for planning, navigation, and management.
-
B.
canyoneering route
chosen
A canyoneering route is a planned path through a canyon that specifies the sequence of natural obstacles, required techniques, equipment, and difficulty level for safely descending or traversing it.
-
C.
canyon area
A canyon area is a deep, narrow valley with steep sides, often carved by a river, encompassing its rocky walls, floor, and surrounding terrain.
-
D.
rim of canyon
The rim of a canyon is the elevated edge or boundary where the relatively flat surrounding terrain abruptly transitions into the steep walls descending into the canyon below.
-
E.
mountain segment
A mountain segment is a distinct portion of a mountain range or massif, defined by relatively continuous topography, geological structure, or geomorphological features that differentiate it from adjacent sections.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0ef89d2c88190a6d0d5116ccd7cc9 |
completed | April 28, 2026, 5:34 p.m. |
Created at: April 28, 2026, 6:49 p.m.