Triple
T2956407
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lost River Cave |
E79940
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | underground river |
C79
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: underground river Context triple: [Lost River Cave, instanceOf, underground river]
-
A.
river
chosen
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
B.
underground structure
An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
-
C.
river gorge
A river gorge is a deep, narrow valley with steep, often rocky walls carved over time by the persistent erosive action of a river.
-
D.
cavern hall
A cavern hall is a vast, naturally formed underground chamber characterized by high ceilings, expansive open space, and geological features such as stalactites, stalagmites, and rock formations.
-
E.
water supply tunnel
A water supply tunnel is an underground passage constructed to convey water from its source to treatment facilities, storage reservoirs, or distribution networks, often over long distances and through challenging terrain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b1276588190a374a0b12e0f7bdf |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 2:57 p.m.