Triple

T2954941
Position Surface form Disambiguated ID Type / Status
Subject CHAdeMO E79908 entity
Predicate version P3286 FINISHED
Object CHAdeMO 1.0 E79908 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CHAdeMO 1.0 | Statement: [CHAdeMO, version, CHAdeMO 1.0]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CHAdeMO 1.0
Context triple: [CHAdeMO, version, CHAdeMO 1.0]
  • A. CHAdeMO chosen
    CHAdeMO is a fast-charging standard for electric vehicles, originally developed in Japan and widely used for DC rapid charging, particularly by early Nissan and Mitsubishi EV models.
  • B. CCS (Combined Charging System)
    CCS (Combined Charging System) is a widely adopted fast-charging standard for electric vehicles that combines AC and DC charging capabilities in a single connector design.
  • C. NACS (North American Charging Standard, newer North American models)
    NACS (North American Charging Standard) is Tesla’s proprietary fast-charging connector design that has become a de facto standard for newer electric vehicles in North America.
  • D. Tesla Megacharger
    Tesla Megacharger is a high-power fast-charging system developed by Tesla to rapidly charge its electric Semi trucks for long-haul commercial use.
  • E. Ventra
    Ventra is the contactless fare payment system used across Chicago’s public transit network, including buses and trains.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1276588190a374a0b12e0f7bdf completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad99286ac8819084f02fbb0a1616d3 completed March 8, 2026, 3:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69b108dae9ac8190b72faf84e75a60c7 completed March 11, 2026, 6:16 a.m.
Created at: March 8, 2026, 2:57 p.m.