Triple

T2954866
Position Surface form Disambiguated ID Type / Status
Subject IEC 61851 E79907 entity
Predicate relatedTo P37 FINISHED
Object IEC 62196 E319205 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IEC 62196 | Statement: [IEC 61851, relatedTo, IEC 62196]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: IEC 62196
Context triple: [IEC 61851, relatedTo, IEC 62196]
  • A. IEC 62196-2 chosen
    IEC 62196-2 is an international standard that defines the dimensions, performance, and safety requirements for AC charging connectors used for electric vehicles, including the widely adopted Type 2 plug in Europe.
  • B. IEC 62196-3
    IEC 62196-3 is an international standard that defines the physical and electrical requirements for DC charging connectors and inlets used in electric vehicle fast-charging systems.
  • C. IEC 61851
    IEC 61851 is an international standard that defines the general requirements, communication, and safety aspects for conductive charging systems of electric vehicles.
  • D. ISO 15118
    ISO 15118 is an international standard that defines secure, high-level communication between electric vehicles and charging stations, enabling features like plug-and-charge and smart charging.
  • E. CCS (Combined Charging System)
    CCS (Combined Charging System) is a widely adopted fast-charging standard for electric vehicles that combines AC and DC charging capabilities in a single connector design.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1276588190a374a0b12e0f7bdf completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad99286ac8819084f02fbb0a1616d3 completed March 8, 2026, 3:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69b1eedb51b88190b7a009d45361fd32 completed March 11, 2026, 10:38 p.m.
Created at: March 8, 2026, 2:57 p.m.