Triple

T2954818
Position Surface form Disambiguated ID Type / Status
Subject Type 2 AC connector E79906 entity
Predicate typicalMaxVoltage P10795 FINISHED
Object up to 480 V AC (three-phase) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: up to 480 V AC (three-phase) | Statement: [Type 2 AC connector, typicalMaxVoltage, up to 480 V AC (three-phase)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: typicalMaxVoltage
Context triple: [Type 2 AC connector, typicalMaxVoltage, up to 480 V AC (three-phase)]
  • A. maxVoltage chosen
    Indicates the maximum electrical potential (voltage) that an entity can safely or normally handle, provide, or operate at.
  • B. supportsMaximumVoltage
    Indicates that an entity is capable of safely operating at or up to a specified maximum voltage level.
  • C. batteryCapacity
    Indicates the amount of electrical energy a battery can store or deliver, typically expressed in units like mAh or Wh.
  • D. maximumPowerDuringOperation
    Indicates the highest level of power that occurs while the system or component is operating.
  • E. gridVoltageLevel
    Indicates the electrical voltage level at which a power grid or network segment operates.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1276588190a374a0b12e0f7bdf completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad98ff874c81908077a90fdc5e8549 completed March 8, 2026, 3:42 p.m.
PD Predicate disambiguation batch_69ad960c5c8881909d679912bd7d78f3 completed March 8, 2026, 3:30 p.m.
Created at: March 8, 2026, 2:57 p.m.