Triple

T2953319
Position Surface form Disambiguated ID Type / Status
Subject First National Bank building (Tampico) E79871 entity
Predicate instanceOf P0 FINISHED
Object bank building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bank building
Context triple: [First National Bank building (Tampico), instanceOf, bank building]
  • A. financial institution
    A financial institution is an organization that manages money and financial services, such as accepting deposits, providing loans, facilitating investments, and enabling payment transactions for individuals, businesses, and governments.
  • B. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • C. banker
    A banker is a financial professional who manages, safeguards, and allocates money and credit for individuals, businesses, and institutions through banking services and financial products.
  • D. river bank
    A river bank is the sloping land alongside a river that confines its water flow and shapes its course.
  • E. Bank of America Tower
    Bank of America Tower is a conceptual class representing a high-rise commercial office building owned or branded by Bank of America, characterized by its location, architectural features, tenants, and sustainability attributes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1276588190a374a0b12e0f7bdf completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 2:57 p.m.