Triple
T29526482
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CubeSat Design Specification |
E749083
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering specification |
C23037
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering specification Context triple: [CubeSat Design Specification, instanceOf, engineering specification]
-
A.
engineering standard
An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
-
B.
materials specification
A materials specification defines the required types, properties, standards, and quality criteria for materials to be used in a product, component, or construction.
-
C.
Technical specification
A technical specification is a detailed, formal document that precisely defines the functional, performance, and interface requirements of a system, component, or product to guide its design, implementation, and verification.
-
D.
specification
chosen
A specification is a detailed, precise description of requirements, behaviors, and constraints that a system, component, or process must satisfy.
-
E.
engineering treatise
An engineering treatise is a comprehensive, systematically organized written work that rigorously analyzes, explains, and documents engineering principles, methods, designs, or systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0bd46d99c81908ba9d01cc1dbef7d |
completed | April 28, 2026, 1:59 p.m. |
Created at: April 28, 2026, 4:46 p.m.