Triple
T29522136
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BR Eastern Region |
E748963
|
entity |
| Predicate | electrificationIncludes |
P194012
|
FINISHED |
| Object | Great Eastern suburban lines |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Great Eastern suburban lines | Statement: [BR Eastern Region, electrificationIncludes, Great Eastern suburban lines]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: electrificationIncludes Context triple: [BR Eastern Region, electrificationIncludes, Great Eastern suburban lines]
-
A.
electrificationUsedBy
Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
-
B.
electrificationCompatibility
Indicates whether one entity can be effectively and safely powered, charged, or operated using the electrical system, standards, or infrastructure associated with another entity.
-
C.
electrificationUsedFor
Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
-
D.
electrification
Indicates the process or state of providing electrical power or converting something to operate using electricity.
-
E.
electrificationSystem
Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0bd46d99c81908ba9d01cc1dbef7d |
completed | April 28, 2026, 1:59 p.m. |
| NER | Named-entity recognition | batch_69fd5d48855c8190bd93070b6a00d8b5 |
completed | May 8, 2026, 3:49 a.m. |
| PD | Predicate disambiguation | batch_69fd5c9aabb88190912800d90184a89d |
completed | May 8, 2026, 3:46 a.m. |
| PDg | Predicate description generation | batch_69fd5d47da488190a4f2dbd44a0a83b2 |
completed | May 8, 2026, 3:49 a.m. |
Created at: April 28, 2026, 4:42 p.m.