Triple

T29522136
Position Surface form Disambiguated ID Type / Status
Subject BR Eastern Region E748963 entity
Predicate electrificationIncludes P194012 FINISHED
Object Great Eastern suburban lines NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Great Eastern suburban lines | Statement: [BR Eastern Region, electrificationIncludes, Great Eastern suburban lines]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationIncludes
Context triple: [BR Eastern Region, electrificationIncludes, Great Eastern suburban lines]
  • A. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • B. electrificationCompatibility
    Indicates whether one entity can be effectively and safely powered, charged, or operated using the electrical system, standards, or infrastructure associated with another entity.
  • C. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • D. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • E. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0bd46d99c81908ba9d01cc1dbef7d completed April 28, 2026, 1:59 p.m.
NER Named-entity recognition batch_69fd5d48855c8190bd93070b6a00d8b5 completed May 8, 2026, 3:49 a.m.
PD Predicate disambiguation batch_69fd5c9aabb88190912800d90184a89d completed May 8, 2026, 3:46 a.m.
PDg Predicate description generation batch_69fd5d47da488190a4f2dbd44a0a83b2 completed May 8, 2026, 3:49 a.m.
Created at: April 28, 2026, 4:42 p.m.