Triple

T29482117
Position Surface form Disambiguated ID Type / Status
Subject Prelude FLNG E747816 entity
Predicate instanceOf P0 FINISHED
Object floating liquefied natural gas facility C55795 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: floating liquefied natural gas facility
Context triple: [Prelude FLNG, instanceOf, floating liquefied natural gas facility]
  • A. floating production storage and offloading vessel
    A floating production storage and offloading vessel is an offshore ship-shaped facility that processes hydrocarbons from subsea wells, stores the produced oil, and offloads it to shuttle tankers for transport.
  • B. floating building
    A floating building is a structure designed to remain buoyant and stable on water or in the air, providing habitable or functional space independent of traditional land-based foundations.
  • C. floating market
    A floating market is a marketplace where vendors sell goods, often fresh produce and local foods, directly from boats on rivers or canals.
  • D. liquefied natural gas project
    A liquefied natural gas project is a large-scale industrial development that encompasses the extraction, processing, liquefaction, storage, and transportation infrastructure required to produce and export natural gas in liquid form.
  • E. floating lighthouse
    A floating lighthouse is a buoyant navigational structure that drifts or is moored at sea while emitting light signals to guide vessels and mark hazards.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0bd43ba30819095eb1cfc3adf525c completed April 28, 2026, 1:59 p.m.
Created at: April 28, 2026, 4:04 p.m.