Triple

T29475742
Position Surface form Disambiguated ID Type / Status
Subject Hong Kong Polytechnic (graphic design) E747642 entity
Predicate languageOfInstruction P56 FINISHED
Object English E211 NE FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0bd42cf308190bb01b20bc5b7c2d0 completed April 28, 2026, 1:59 p.m.
Created at: April 28, 2026, 4 p.m.