Triple

T2947096
Position Surface form Disambiguated ID Type / Status
Subject Northern Spain E79528 entity
Predicate hasRiver P165 FINISHED
Object Ebro E42296 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ebro | Statement: [Northern Spain, hasRiver, Ebro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ebro
Context triple: [Northern Spain, hasRiver, Ebro]
  • A. Ebro River chosen
    The Ebro River is one of the longest and most significant rivers in Spain, flowing eastward across the northern Iberian Peninsula to the Mediterranean Sea.
  • B. Duero
    The Duero is one of the principal rivers of the Iberian Peninsula, flowing westward from central Spain into Portugal before emptying into the Atlantic Ocean.
  • C. Ribera d’Ebre
    Ribera d’Ebre is a comarca (county) in Catalonia, Spain, known for its strategic position along the Ebro River and as a key setting of the Spanish Civil War’s Battle of the Ebro.
  • D. Guadalquivir River
    The Guadalquivir River is one of Spain’s major rivers, flowing through Andalusia and the city of Seville before emptying into the Atlantic Ocean.
  • E. Guadiana River
    The Guadiana River is a major waterway of the Iberian Peninsula that flows through Spain and Portugal, forming part of their border before emptying into the Atlantic Ocean.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1089588190b74d9e2505e45762 completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad98b5916c8190b1163bf0b7fa136a completed March 8, 2026, 3:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69b08695bea08190abce552493abda57 completed March 10, 2026, 9:01 p.m.
Created at: March 8, 2026, 2:57 p.m.