Triple

T29465468
Position Surface form Disambiguated ID Type / Status
Subject Boeing (gunship conversion) E747365 entity
Predicate instanceOf P0 FINISHED
Object military aircraft conversion program C55644 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military aircraft conversion program
Context triple: [Boeing (gunship conversion), instanceOf, military aircraft conversion program]
  • A. anti-submarine warfare aircraft program
    A coordinated initiative to design, develop, acquire, and sustain specialized aircraft, systems, and capabilities dedicated to detecting, tracking, and neutralizing submarine threats.
  • B. U.S. Army aviation program
    The U.S. Army aviation program encompasses the development, training, operation, and maintenance of rotary- and fixed-wing aircraft to provide air mobility, reconnaissance, attack, and support capabilities for Army missions.
  • C. military aircraft
    A military aircraft is a powered flying vehicle specifically designed, equipped, and operated by armed forces to conduct combat, support, reconnaissance, or training missions in defense and warfare operations.
  • D. maritime patrol aircraft program
    A maritime patrol aircraft program is an organized effort to design, acquire, operate, and sustain aircraft and supporting systems dedicated to long-range surveillance, anti-submarine warfare, and protection of maritime domains.
  • E. bomber aircraft project
    A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0bd4125f88190b56104591351619c completed April 28, 2026, 1:59 p.m.
Created at: April 28, 2026, 3:52 p.m.